How to Accept a Website from a Contractor: A Checklist

Acceptance is the last moment when you have leverage: the final payment hasn’t been made yet, and the contractor is eager to wrap up the project. Once the payment is transferred, any request becomes just that—a request. That’s why it’s worth taking an evening to treat the work as just that—work—rather than a pleasant surprise.

We've compiled the technical aspects—forms, speed, mobile version, meta tags—separately in Pre-launch checklist; take a look at it before reading this article. Below, we’ll discuss the other side of the acceptance process: what to compare it against, what else to include besides the website itself, and how to document the results.

Check the documents, not your impressions

You might like the website even if it doesn’t meet the terms of the agreement—and vice versa. Open the technical specifications and go through them point by point: what was promised, what was delivered. That’s exactly why the technical specifications are needed; if there aren’t any, you’ll have to cross-reference the correspondence, and that always leads to disputes. To learn how to draft them in advance, see the article on Website Specifications.

The second source is the contract: what it says about the warranty, the number of revisions, and the transfer of rights. The points to look for are discussed in the article about Website Development Contract.

Please submit a valid application using each form

This is the only technical point I’ll highlight here separately, because it’s the one most often overlooked, yet it’s the most expensive. Fill out and submit the form from the home page, the service page, the modal window, or the callback form. Make sure the message was received. in the inbox, not in spam, and that the data in it is readable. If requests are supposed to be sent to Telegram or a CRM, check there as well.

A website that silently loses submissions looks perfect on the surface. People find this out a month later, when they're surprised by the silence.

What else do you accept besides the website itself?

A website is more than just pages. Along with it, you should receive:

  • Administrative Access with owner privileges, not editor privileges. Change the password immediately and delete the test users.
  • Access to hosting and the database — even if it is administered by the contractor.
  • A domain registered in your name, and access to the registrar's account. This is the most common pitfall in this niche, and people often don't realize it until years later—read more in the article In whose name should the domain and hosting be registered?.
  • Source code and layouts — If the contract so provides, accept them in fact, not just as a promise.
  • Licenses for paid components: themes, plugins, fonts, stock photos. A license issued to a studio expires when the studio closes.
  • Access to Analytics — The account must be yours, with the performer listed as a guest, not the other way around.

It's convenient to list this in an email: what was transferred, when, and to whom. A year from now, you won't remember who still has access to the FTP.

Backups: Ask for specifics

There are three questions that require clear answers: where are the backups stored, how often are they created, and which of them has been used to restore the website at least once? The answer “the hosting provider does it themselves” is an assumption, not a backup. A backup that has never been restored often turns out to be empty when a failure occurs.

Ask them to show you how to use it

Before signing the acceptance report, open the admin panel together and ask the developer to demonstrate the following on screen: adding a service, changing a price, publishing a news article, uploading a photo, and editing the text on the homepage. If a developer is needed for every action, the website is poorly designed, and it’s better to find that out now.

Record the meeting on video or ask for brief instructions. This saves you dozens of follow-up inquiries in the first year.

How to Submit a Comment

Compile everything you've found into a single document: a link to the page, a brief description, and a screenshot. Divide it into two groups:

  • Blocks reception — The feature isn't working on mobile devices, the form isn't submitting requests, the website isn't accessible from a phone, and access credentials haven't been provided.
  • To be finalized after launch — cosmetics, suggestions, and ideas that came up along the way.

A contractor can complete one structured list in a few days. Twenty messages in a messenger app over the course of a week will take them a month to complete, and they’ll lose half of them. And keep in mind: requests from the second group that weren’t in the technical specifications are new work, not leftover tasks.

Comment Period

A best practice worth including in the contract: the client has a few business days to provide feedback, after which the phase is considered accepted. This ensures discipline on both sides—the contractor doesn’t disappear, and the project doesn’t get stalled for a month because “we haven’t looked at it yet.”

When to take nothing

Sometimes a website is delivered, but it’s impossible to work with it: it’s slow, difficult to manage, and requires edits for every little thing. In that case, the question is no longer whether to accept it, but whether to refine it or start over—and the answer depends on what’s inside.

We start these audit stories by looking at the code, performance, and structure—and we tell you straight up which option is cheaper. This is part of website maintenance and updates. If it turns out to be easier to start over, the budget estimate will provide cost calculation. And to make it easier next time, take a look at what questions you should ask before you start — How to Choose a Contractor and the rest of the articles in this section How to Order a Website.

See also the "How to Order a Website" section